• If you're struggling to login because of the verification email not reaching you, don't worry it's just the forum settings applying the change slowly. I'll get in touch with those who are awaiting the verification email and sort your accounts out. I think new ones should go through fine now in most cases.

EF: THTC and SPD's

Currently reading:
EF: THTC and SPD's

F

ferg

THTC and SPD's

Probably more of a question for those north of the border.
What is everyone doing for Board changes with Total Heating Total Control?

I had thought to use a 4 pole SPD in a separate enclosure but Space is a bit limited and adding another 8w board might be a bit tight.
Or additional SPD kit in an SPD split load board with an additional small board for the hot water.

For context it's 2 THTC boards on separate phases and a domestic board on the third phase.
So would need 2 additional 8w boards for the first option.

Each THTC board has 6 peak time loads, 6 off peak loads and the timed hot water. so a slightly modified hi integrity dual rcd board, ( Main switches and RCBO's for 2 feeds, RCD and MCB for hot water.) was my previous method.

The storage heaters are the old type with no electronics, the hot water doesn't have timers, electric showers and panel heaters do have electronics. So a possible but not great argument for using SPD only on the 24hr side.

None of my solutions are ideal so hoping someone else has a better one. :rolleyes:

.

THTC and SPD's to Continue reading...

ElectriciansForums.net for the latest in electricians' jobs, news, advice and more
 
Back
Top